Infrastructure projects face an increasingly complex environmental regulatory landscape — 14+ state moratoria on data centers, NEPA reviews for federal land crossings, endangered species consultations, and wetlands permitting. LandAxis embeds environmental compliance from day one, not as an afterthought. Our environmental team works alongside ROW agents, title researchers, and developers to identify risks early and build compliance into the project plan.
Threatened and endangered species surveys, habitat assessments, avian and bat studies for wind/solar, desert tortoise surveys, migratory bird compliance (MBTA/BGEPA).
USACE jurisdictional determinations, wetland delineation (routine and comprehensive), Section 404 permits, nationwide permits, state water quality certifications.
Categorical exclusions, environmental assessments (EA), environmental impact statements (EIS), agency consultation, public comment facilitation. Federal crossing requirements.
ASTM E1527-21 Phase I environmental site assessments, recognized environmental conditions (RECs), Phase II sampling and analysis, remediation planning.
Construction-phase environmental monitoring, erosion/sediment control inspection, stormwater management (SWPPP), spill prevention (SPCC), and restoration verification.
Wetland mitigation banking, habitat conservation plans (HCPs), compensatory mitigation design, conservation easement negotiation, and long-term stewardship plans.
Navigate 14+ state moratoria, manage community opposition, conduct water use studies, and secure environmental clearances. Explore data centers.
Avian and bat studies, habitat impact assessments, viewshed analysis, and mitigation strategies for wind and solar projects. Explore renewables.
Waterbody crossings, wetland impacts, horizontal directional drilling (HDD) environmental monitoring, and mitigation planning. Explore pipelines.
Tower siting environmental reviews, small cell NEPA assessments, and compliance for wireless infrastructure expansion. Explore telecom.